Thursday, November 28, 2024

Progress on Box Rebuild ... UPDATE !!!

As the song goes " You .... and when to Fold-Em" .. The wood type and warpage proved to severe to correct .. So this project goes in the Lessons Learned bucket .. goodbye old friend...... 

Using JB Epoxy to help mitigate warpage and rebuild box Body and Lid. I'll use Epoxy in lue of Titebond 3 to complete the rebuild. 


Wednesday, November 27, 2024

Pencil Case finished ..

 New Base; nice and solid. Lid slides smoothly (no warping)

Finished Box





Well that went like a Fart in Church .. from TLC to a Total Rebuild.....

This small box needs a rebuild and repairs .. warpage caused cracks and glue line separation. The Open Design cut into the lid is the main source of warpage damage.

A couple of boxes require TLC

Hinge Lid box with Open Design .... I got both these boxes in China in 2004. Need to revisit this fix may need more love !!!!New base for the sliding lid pencil box. The original base warped and separated from the frame.




Saturday, November 23, 2024

Installed Sewing Machine Input - Outfeed Table with under table storage.

Table installed .. Removable section, held by magnets. This allows access to change Bobbins. Storage Box in place under table.Ready for First Test Run ....


Friday, November 22, 2024

Sewing Machine: Infeed / Outfeed work surface

Underside: Solid support with under table storage area. Ready for Test Fit & Trial Run.  Removable section held in place by 10mm Neodymium Magnets, this facilitates "Bobbin Changing.   


Work Bench .. Improvement ... added Large Cutting Mat

 Overview of: 59" x 36" Mat (Robbie's old/much used mat)Right Hand Side detailView from users side ... Extremely useful addition 


Thursday, November 21, 2024

Making a Sewing Machine Infeed Table.. for "The Boss"

Goal: replace existing table with a more stable table with "EASY" access to change Bobbins. After some basic cutting to size (Table Saw & Miter Saw) the first glue-up... to be continued..